More Projects
Project Name |
Cost |
Client |
Contractor |
End Year |
Scope of Work |
Netcare Pretoria East Hospital | R12 000 000 | CKR | W3O (Washirika Oaks) | Nov 2021 | Chilled & Hot water plant and 13 x off Theatre Upgrade |
Ikusasa Oford Parks | R20 500 000 | Adaptive Resources-(C. Cumming) 0827792550 | Concor | Nov 2022 | 4 Storeybuilding with FCU, chillers, basement ventilation, etc. |
WITS CLM | R3 100 000 | Maninga Engineering | Tri-Star | Dec 2021 | 3 Storeybuilding with chilled beams, chiller, fresh air conditioning, etc. |
Oxford building 2-Life | R19 000 000 | Adaptive Resources-(C. Cumming) 0827792550 | Concor | Dec 2020 | 5 Storeybuilding with FCU, chillers, basement ventilation, etc. |
Radisson Red Hotel | R23 500 000 | Adaptive Resources-(C. Cumming) 0827792550 | Concor | April 2021 | 8 Storey Hotel with FCU, chillers, basement ventilation. etc. |
Deloitte Basement Ventilation | R5 500 000 | Adaptive Resource-(C. Cumming) 0827792550 | WBHO | Jan 2020 | Basement Ventilation |
Destiny Hotel | R19 550 000 | GPCE | Tri-Star | Dec 2019 | 5 Storey Hotel with FCU, chillers, basement ventilation, etc. |
ABSA Towers Main | R16 160 000 | WSP | WBHO-Motheo JV | Dec 2019 | 4 x 300kW chiller, 2 x 2000l Buffer tank- 30 Storey Building |
Oxford Building 5-Arup | R6 000 000 | Arup | Concor | Dec 2019 | 3 Storey – VRV system with compl ventilation |
BP SA | R18 700 000 | Adaptive Resources-(C. Cumming) 0827792550 | Concor | Nov 2011 |
5 Storeybuilding with 500 x off FCU, chillers, basement ventilation, etc. |
IC Werksmans- Office Block | R30 000 000 | Adaptive Resources-(C. Cumming) 0827792550 | Group Five | Sep 2017 | 15 Storey building with 670 x off FCU, chillers, basement ventilation, etc. |
140 West- Office Block | R47 000 000 | Adpative Resources-(C. Cumming) 0827792550 | Tiber/WBHO JV | Sep 2017 | 15 Storeybuilding with 674 x off FCU, chillers, basement ventilation, etc. |
Sasol Head Office Kathrine St | R100 000 000 | Adaptive Resources | Aveng-Grinaker LTA | 2014 | 10 Storeybuilding with 1915 x off FCU, chillers, basement ventilation, etc. |
Vodacom Upgrade | R20 000 000 | Spoormaker & Partners | VNA | 2015 | Upgrade and refurbishment of Renaisance, Corporate and Cmmercial Park buildings, incl. chiller replacement chilled water reconfigartions, BMS and control upgrade, etc. |
Vaalwater Shopping Mall | R7 000 000 | Imech | Burlanka | 2014 | Chiller with turbo compressor, Cooling tower and chilled water AHU’s. |
Alice Lane Sandton | R 22 000 000 | Adaptive Resources | Tiber Bonvic | 2014 | 5 Storey building with a chilled water system comprising of 2 x 600kW air-cooled chillers with AHU, 540 x off FCU’s & BMS |
NewTown | R 6 000 000 | WSP | WBHO | 2014 | Basement Ventilation with special support structures |
MTN Bloemfontein | R 7 000 000 | ADS | SKT Construction | 2014 | Computer room units with chilled water, chillers, VRV and DX system |
SAAB Grintek | R 10 000 000 | TPS Consulting | HL Kroon | 2014 | Chilled Water sys wit 1 x 750kw & 1 x 450kW chillers and 306 x FCU’s. |
Unitrans | R 5 330 640 | MRPD | Direct to Steinhoff | 2013 | Refurbishment of 4 Storey building with a chilled water system comprising of 1 x 700kW air-cooled chillers with AHU & VAV diffusers |
HP Senderwood | R 2 500 000 | Spoormaker & Partners | Direct to Drake and Scull | 2013 | Close Control Computer Room Units |
Taung Mall | R 6 000 000 | WinConsutling | Kroon Construction | 2013 | Rooftop and DX ducted split unit systems |
44 Grand Central-MTC | R 7 000 000 | Adaptive Resources | Lyncon | 2013 | 4 Storey Building With Chilled Water System With AHU, FCU and BMS |
Inyanda | R 6 200 000 | Adaptive Resources | Direct Contract | 2012 | Refurbishment of Chilled Water System With Chillers, AHU and BMS |
Femina Hospital | R 6 000 000 | Spoormaker & Partners | Group 5 | 2013 | New Chilled Water System With Chiller, AHU and FCU |
Uni Of JHB-Leslie Boyd | R 2 000 000 | Spoormaker & Partners | GVK Siya Zama | 2012 | Close Control and Rooftop Units With Ducting |
SARS Waterkloof | R 6 000 000 | Mekan | Cpro | 2012 | VRV System |
Equity Pharmaceutical | R 2 600 000 | Mekan | Archstone | 2012 | VRV System |
Tembisa Police Station | R 3 300 000 | Boba | Radon Projects | 2012 | VRV System |
Waterfall LP20 | R 4 000 000 | Qmech | Group 5 | 2012 | New Chilled Water System With Chiller, AHU and FCU |
Linmed Hospital | R 3 000 000 | Spoormaker & Partners | Group 5 | 2012 | New Chilled Water System With Chiller, AHU and FCU |
Innovation Randburg | R 8 000 000 | Aftek | Tri-Star | 2011 | Refurbishment of Chilled Water System With Chillers, AHU and BMS |
One Protea Place | R 20 000 000 | Aftek | Murray & Roberts | 2010 | Chilled Water System With FCU, 2 Stage FA Evap Cool; Heatpump and BMS |
Sasol Infrachem Lab | R 20 000 000 | CA du Toit | Concor | 2011 | Chilled Water System With FCU and Steam Heating FA Carbon FA System |
Telkom-TTN & Annex | R 20 000 000 | TFMC | Direct Contract | 2010 | Ice Storage Plant |
Riverwalk Office Park | R 25 000 000 | Spoormaker & Partners | Mvela Phanda Constr | 2009 | Chilled Water System With FCU and BMS |
Vodacom Corporate Park | R 8 000 000 | Spoormaker & Partners | Direct Contract | 2009 | Chilled and Condenser Water System Upgrade and BMS |
Melrose Arch Retail | R 25 000 000 | Spoormaker & Partners | Murray & Robberts | 2008 | Chilled Water System With FCU and BMS |
Bankserve | R 5 200 000 | CNN Advies | Direct Contract | 2008 | DX-Computer Room Units |
Telkom Media | R 9 000 000 | Spoormaker & Partners | Giuricich Bros | 2008 | LG-DX Split Units and LG Rooftop Package Units |
GIBS | R 2 800 000 | Africon | Giuricich Bros | 2008 | LG-DX Split Units and LG Rooftop Package Units |
Porche-Sandton | R 3 300 000 | C3-Engineers | Gothic | 2008 | LG-DX Split Units and Dunham Bush Rooftop Package Units |
Mr Price-Greenstone | R 4 000 000 | RPP | Interkor Konstruksie | 2008 | Viking Rooftop Package Units |
JHB Int. Airport | R 3 300 000 | Palace Engineering | Trencon Construction | 2008 | Chilled Water and HVAC Installation to Internation Terminal Extention |
Lexus | R 700 000 | Adaptive Resources | Marray & Dickson Cons. | 2008 | HVAC Installation to New Showrooms |
Mpungubwe | R 500 000 | Q Mech | DLR Projects | 2008 | Apartment Ventilation Installation |
Cedar Square | R 1 500 000 | WSP | Group 5 | 2008 | HVAC Installation to Woolworths & Ster Kinekor |
University of Pretoria | R 1 000 000 | Plantech | University of PTA | 2008 | Chiller Replacement |
Mercedes Benz | R 2 070 000 | RPP | Giuricich Boss | 2008 | Chilled Water Installation With Chiller and AHU’s |
Civitas Bldg Upgrade | R 58 000 000 | Grinaker Karen Kula JV | Grinaker Karen Kula JV | 2009 | Replacement of Chilled Water System. 1700x FCU’s, BMS, Elec, Pipe, etc. |
Tembisa Hospital | R 5 000 000 | Mekan | Yikusas Stocks JV | 2008 | Chilled water and Steam Heat Installation With Chiller and AHU’s |
CBI Offices | R 85 000 | AC Consult | LV Projects | 2006 | DX Split HVAC System |
Eskom Simmerpan | R 1 150 000 | Eskom | Eskom | 2006 | Replacement of Chilled Water System. BMS, Elec, Pipe, etc. |
Tembisa Library | R 55 000 | Ubunye Engineering | Bhekanani Builders | 2006 | DX Split HVAC System |
Silverlake Shopping Cntr. | R 1 700 000 | Africon | Bekkers Construction | 2006 | Rooftop Package Units and DX Split Units |
Anchor Yeast | R 1 500 000 | AC Consult | Bartlett Construction | 2006 | Rooftop Package Units and DX Split Units |
Vodacom Phase 5 | R 5 000 000 | Adaptive Resources | Rainbow | 2006 | Close Control and DX Split System |
Midwater Mall | R 2 900 000 | Africon | Tri-Star | 2005 | Rooftop Package Units |
Aunde Durban Phase 3 | R 4 000 000 | Mekan | Armstrong | 2005 | 20 000m² wharehouse/factory-Chilled Water System With 2 x 665kW, 8 x 150kW AHU’s, 2 x Open Circuit Cooling Towers |
British American Tobacco Heidelberg | R 682 000 | DLV | Bartlett Construction | 2005 | Air-Conditioning For New Factory Extensions |
ABI Midrand | R 850 000 | Adaptive Resources | Renniks Construct | 2005 | Fresh Air Pressurization, Factory Extraction |
Woolworths Midridge Square | R 200 000 | Ubunye Engineering | G.D. Irons | 2005 | Heat-recovery and DX Split AC Installation |
TFMC Halfway House | R 2 050 000 | TFMC | GVK Siya Zama | 2005 | Chilled Water Installation With Closed Control Units |
British American Tobacco Heidelberg | R 682 000 | DLV | Exabuild (Bartlett Construction) | 2005 | Air-Conditioning For New Factory Extensions |
Edenmeadow | R 842 663.87 | WSP | Edilcon Construction | 2005 | Air-Conditioning For Woolworths, Clicks, Truworths, and Line Shops |
SABC Hatfield | R 560 277 | Multi Pro Cost Engineering | GVK Siya Zama | 2004 | Installation of 2x Chillers and 4x AHU’s |
DHA Waltloo | R 1 732 000 | VMG Consultants | Dreamworld | 2004 | Refurbishment of VAV System |
Millpark Hospital | R 611 492 | Spoormaker & Partners | Netcare | 2004 | Refurbishment of Laminar Flow Theaters |
Walter Sisulu Auditorium | R 2 863 249 | Palace Engineering | Grinaker LTA | 2004 | Installation of 2x 300kW Rooftop Units for Auditorium and 9x Ducted Condenser Rooftops for Offices |
House Steyn Thabazimbi | R 1 816 377 | Spoormaker & Partners | GIP Builders | 2005 | Chilled Water Installation with 2x Hydro Chillers, 4x AHU’s With VAV Duct Dampers |
Melrose Arch New Canteen | R 173 650 | Spoormaker & Partners | Murray & Roberts | 2004 | Ventilation and DX Cooling System |
National Intelligence Agency | R 3 682 515 | Spoormaker & Partners | Elcom Consultants | 2004 | Chilled Water Installation With 2x Chillers 332.8kW, 8x Closed Control AHU’s For Equipment Room |
Sedibeng Municipality | R 3 280 237 | Tobias Engineers | Sedibeng Municipality | 2004 | Refurbishment of Existing Chilled Water System, Replace 3 New Chillers. 2 New Cooling Towers, Coils, Controls and Pipework |
Dainfern Clubhouse | R 659 670 | EC Harris | Tri-Star | 2004 | Design and Supply HVAC System |
Makro Wonderboom | R 5 994 893 | VMG Consultants | Edilcon Construction | 2004 | Chilled water ice storage system with 2 x chillers, 2 x ice tanks, 2 x evaporator condensers & 9 x AHU’s |
Rand Afrikaans University | R 674 770 | Logostikon | RAU | 2004 | Laminar air system with 2 x closed control AHU’s, pumps, etc. |
Magpie Foods | R 1 114 000 | VMG Consultants | Malcolm Arnot | 2004 | New AHU’s Ducting and Diffusers |
Walter Sisulu Square | R 85 000 | Diagonal Projects | 2004 | Ventilation system at taxi rank | |
SABC | R 400 000 | SABC | SABC | 2004 | Chilled water system & packaged units for studio’s |
Eskom Simmerspan | R 1 400 000 | Eskom | Ductech | 2004 | Chilled water system with 2 x 140kW chillers, cooling tower & 3 purpose made AHU’s |
TFMC Telkom Towers North | R 120 000 | TFMC | Ultimate Interiors | 2003 | Install new VAV diffusers and controls |
Shoprite Malamulele Tzaneen | R 853 000 | WSP | Construction Services Tzaneen | 2003 | 150kW Rooftop unit with exposed spiral ducting |
Aunde Durban | R 5 700 000 | Mekan | Aunde | 2003 | 22 000m² warehouse/factory – chilled water system with 2 x 665kW, 1 x 800kW chiller, 18 x 150kW AHU’s, 3 x open circuit cooling towers, over 800m piping |
SAB Head Office Sandton | R 270 000 | Spoormaker & Partners | Stabilid Construction | 2003 | New airconditioning, ducting, VAV diffusers & controls |
Swiss Embassy Pretoria | R 1 200 000 | DLV | GD Irons | 2003 | Daikin VRV R407 split system with heat recovery wheel on fresh air system |
TFMC Alrode | R 90 000 | TFMC | Ductech | 2003 | Supply & install 1 x tanked chiller & AHU |
TFMC Erand | R 420 000 | TFMC | DJ Construction | 2003 | Supply & install 3 x tanked chillers & AHU’s |
TFMC Benmore | R 823 000 | TFMC | TFMC | 2003 | Supply & install 3 x chillers & closed control computer units |
TFMC Doornfontein | R 280 000 | TFMC | Ductech | 2003 | Supply & install 2 x chilled water close control AHU’s |
Cell C Pietersburg | R 400 000 | Ubunye Engineering | Cell C | 2003 | Supply & install 2 x closed control units & room a/c units |
Karaglen | R 300 000 | WSP | Mastec Construction | 2003 | DX split HVAC system for shopping mall |
Planet Fitness & Pick ‘n Pay Craighallpark | R 1 700 000 | EG Africa & VMG Consultants | New Africa Property Consultants | 2003 | Refurbish existing a/c installation, supply & install 1 x 490kW chiller & 118 x FCU’s with chilled water piping |
TFMC Alberton | R 60 000 | TFMC | HC Projects | 2003 | Upgrade customer centre in shopping mall |
Khupe College Of Excellence Mafikeng | R 1 165 000 | Ubunye Engineering | Grinaker LTA | 2003 | Install DX split HVAC system to offices |
Kentron Centurion | R 350 000 | DLV | Kentron | 2003 | Packaged a/c unit serving clean room |
Virgin Active Gymnasium Morningside | R 1 087 000 | Mekan | Radon Projects | 2002 | Supply & install chilled water & water heating plant. Water heating plant consists of storage vessel & heat recovery chiller. As secondary function the swimming pool is heated via a plate heat exchanger. Evaporative cooler is also part of the condenser water circuit. |
British American Tobacco Heidelberg | R 665 000 | DLV | Giuricich Bros | 2003 | Supply & install a/c to training hall & offices, 2 x economy cycle rooftop units & 21 x DX split units |
Simba Chips Isando | R 350 000 | WSP | Simba Chips | 2003 | Industrial ventilation to chips production line |
Console Glass Wadeville | R 159 370 | WSP | Grinaker LTA | 2003 | Mechanical ventilation to compressor house |
Melrose Arch New Canteen | R 400 000 | Spoormaker & Partners | Murray & Roberts | 2002 | Refurbishment of Old House Meat Company Restaurant, consisting of kitchen ventilation and a/c |
Pick ‘n Pay Northcliff | R 1 700 000 | Mekan | Abcon Construction | 2002 | Supply & install 1 x 200kW economy cycle rooftop unit complete with evaporative condenser & insulated ductwork, several DX split units in in-line shops |
Barloworld Johannesburg | R 700 000 | Spoormaker & partners | Timeline Projects | 2002 | Supply & install ventilation & rooftop a/c with several individual DX split units |
Wits University | R 600 000 | Gama Gamedze | Tri-Star | 2002 | Senate House ventilation & a/c upgrade |
Rand Afrikaans University | R 300 000 | RAU | Gordon Verhoef | 2002 | Supply & install ventilation & a/c |
Magistrates Court Brakpan | R 320 000 | Palace Engineering | Motheo Construction | 2002 | Supply & install DX split units |
Kromdraai Post Office Head Office – Pretoria | R 6 000 000 | Palace Engineering | Mvela Manda Construction | 2002 | Supply & install 9 x 170kW rooftop units with 9 000m² of external insulated ductwork (insulation in 2 months) DX system with 700 x VAV diffusers |
Laboria House Pretoria | R 11 400 000 | Plantech | Costa Zervas Projects | 2002 | Supply & install chilled water system with 5 x 480kW chillers & 700 x FCU’s |
MTN Newlands | R 1 200 000 | Palace Engineering | Edilcon Construction | 2002 | Supply & install chilled water a/c system for computer & equipment rooms |
Orca Phase 2 midrand | R 1 000 000 | Mekan | Abcon Construction | 2001 | Supply & install 13 x 62kW ducted a/c units for office block |
Bedford Village Bedfordview | R 500 000 | BFBA | Edilcon Construction | 2001 | Supply & install a/c & pool heating system to gymnasium |
Novell New Offices Sandton | R 400 000 | Richard Pearce & Partners | Murray & Roberts | 2001 | Design, supply & install a/c for office block |
Associated Motor Holding bedfordview | R 350 000 | Mekan | WBHO | 2001 | Parking area ventilation, incorporating smoke exhaust system & split type a/c units |
OK bezaars Kimberley | R 1 030 000 | BFBA | Grinaker LTA | 2001 | Supply & install water cooled AHU’s to shops, including condenser water distribution network & upgrade cooling towers |
Little Company Mary Hospital | R 350 000 | Spoormaker & Partners | Stocks | 2001 | Supply & install a/c & ventilation system for offices, simulator room & bunker area |
Amarosa American Health & Sport Ruimsig | R 500 000 | EG Africa | Aray Projects | 2001 | Supply & install ventilation system, incorporating evaporative coolers |
St. Benedicts College Bedfordview | R 500 000 | Mekan | CT Homes | 2001 | Supply & install swimming pool heating & gymnasium hot water heating |
Telkom Olifantsfontein | R 350 000 | Tilca | Stocks | 2001 | Supply & install dining room a/c kitchen exhaust system incorporating a fire suppression system |
Monash University Roodeport | R 1 000 000 | Van Zyl & De Villiers | Albron Construction | 2001 | Supply & install 1 x Trane chiller feeding 4 x Güntner AHU, 1 x DX close control Airedale computer room unit, fresh air & toilet extract |
Sentech Various | R 15 000 000 | Sentech | Sentech | 2011 | A/C installation for various transmitter stations throughout the country, Umtata, Cape Town, Durban, etc. |
Kinesis Logistics Phase 1 – 3 Elandsfontein | R 3 700 000 | Willis Aereboe | Bartlett Construction | 2000 | Supply & install 1 x Carrier 80kW, FCU’s, insulated chilled water piping, 4 x DX close control computer room units, FA & toilet extract. 3 x 250kW roof top units to supply conditioned air via internally insulated ducting warehouse with an area of 6 500m² |
Montana Crossing | R 3 000 000 | Mekan | GD Irons | 2000 | Supply & install DX split a/c units for 40 shops. Unit capacity vary from 9kW – 100kW & 8 x evaporative coolers |
Sasol PQ Chem Computer Room – Sasol 1 & 2 | R 800 000 | C.A. du Toit | Sasol | 2000 | Refurbish existing PQ chem computer room a/c system. Existing plant had to be completely removed & replaced with direct expansion duct split system. At no time was it permitted to have the computer room without a/c and this was achieved through careful planning and design. Compressor house control room a/c system was refurbished to operate in highly flammable classified area. |
Forensic Science Laboratory Silverton | R 2 000 000 | EG Africa | Department | 2000 | Supply & install nitrogen, medical gas, Co2, fume cupboard, PVC ducting, electrical & chilled water a/c installation, 12 x AHU’s in total. |
Telkom ATE Germiston | R 600 000 | Infracom | GGC | 2000 | Supply & install 1 x 110kW Ciat chiller feeding 3 x closed control Dunham Bush close control computer room units via insulated chilled water piping. |
Engen Kranskop | R 550 000 | Claassen & Auret | 2000 | Supply & install 4 x 72kW Güntner roof top units which supply conditioned air via internally insulated ducting into restaurant area. | |
Health & Racquet Club Vanderbijlpark & South Gate | R 1 400 000 | Van Zyl & De Villiers | 1999 | Supply & install a/c & water heating plant. Water heating plant consists of 20 000l storage vessel & heat recovery chillers. As secondary function the swimming pool was heated via a plate heat exchanger. Evaporative coolers were also part of the condenser water circuits. |